Fibra Dike Timeline 202417/04/2024 Laboratory HDD process testing18/03/2024 Laboratory testing of the injection mixture202330/11/2023 Workshop Boretto24/08/2023 Construction Finish30/06/2023 Completion of the 2°/3° layer installation 15/06/2023 New DPS installation in the 1° Layer19/04/2023 Construction start01/03/2023 Laboratory testing at the VAW (ETHZ)202219/12/2022 Production at the SOLIFOS factory04/10/2022 EACEF Conference29/09/2022 Launch of the Website29/09/2022 Swiss Italian forum on riverflood: state of the art and research26/08/2022 Construction project concluded28/07/2022 Workshop in Padova18/07/2022 EWG-IE: 28th Annual Meeting, Sheffield (United Kingdom)21/06/2022 Second industrial production of the new DFO sensor03/06/2022 OST-Rhône Contract signing04/02/2022 First industrial production of the new DFO sensor202122/12/2021 OST-AIPO Contract signing26/11/2021 Geotechnical Conference, Rapperswil24/09/2021 OST-BAFU Contract signing